    Three planning decisions worth separating

    An independent TradeShowIntel editorial feature for event meeting preparation. Dassault Systèmes is a useful stop for a manufacturer or logistics operator whose planning challenge spans resources, business rules and changing demand. Its DELMIA portfolio includes both configurable optimization and production scheduling. At Supply Chain Event, the valuable first decision is which planning layer needs attention: the wider supply chain, the factory schedule or the transport network. Bring one disrupted order or constrained operating day and ask the team to map it to the appropriate offering.

    • Quintiq Optimized Planning addresses business-specific constraints across capacity, materials, people and logistics.
    • Ortems Production Scheduler focuses the discussion on finite-capacity sequencing across machines, tools and operators.
    • Quintiq Logistics Planning provides a separate starting point for network, routing and dispatch requirements.
    TL;DR

    The visit in brief

    1. For manufacturing planners, supply-chain teams and logistics operators with a defined constraint problem.
    2. Three different portfolio entry points: supply planning, factory scheduling and logistics planning.
    3. Bring representative orders, resource calendars, operating rules and current system boundaries.
    4. Supply Chain Event runs 1–2 December 2026 at Paris Expo Porte de Versailles, Pavilion 1.
    5. Request a scoped evaluation with agreed inputs and success measures; the portfolio descriptions do not establish a booked show demonstration.

    Dassault Systèmes

    Choose the planning problem first: network-wide constraints, factory sequencing or logistics decisions each call for a different DELMIA conversation.

    Headquarters
    Vélizy-Villacoublay, France
    Industry
    Supply chain and logistics
    Founded
    1981
    Website
    https://www.3ds.com
    Event
    Supply Chain Event 2026
    Dates
    1-2 December 2026
    Key products
    • DELMIA Quintiq Optimized Planning
    • DELMIA Ortems Production Scheduler
    • DELMIA Quintiq Logistics Planning
    Exhibitor briefing

    Connect the planning model to the operating decision

    DELMIA is Dassault Systèmes' operations software brand. Its portfolio covers planning and optimization as well as manufacturing execution and industrial engineering. This shortlist concentrates on the planning products most directly relevant to Supply Chain Event visitors.

    A factory scheduler deciding the order of jobs needs a different model from a logistics planner choosing routes and resources. The distinction matters when comparing proposals: identify the decisions a product should produce, the constraints it must respect and which existing applications remain responsible for orders, execution and master data.

    For a first meeting, a narrowly defined example is more useful than a company-wide transformation brief. A late material delivery, overloaded work centre or changed customer time window creates a practical way to examine planning behaviour. The suggested exercises below are buyer evaluation scenarios; their availability at the event must be arranged with the exhibitor.

    Buyer fit

    Where this conversation earns its place

    Prepare one disrupted order or operating day, its resource constraints, current planning inputs and the system that executes the plan.

    Good fit if you

    • Manage competing capacity, material or workforce constraints that spreadsheets no longer handle consistently.
    • Need to sequence production across several resources and account for changeovers or work-in-process.
    • Run transport operations where network choices, routing and daily dispatch affect one another.
    • Can provide representative data and involve the planners who will use and maintain the model.

    Skip if

    • Only need a simple order-entry or stock-recording tool, with no planning optimization requirement.
    • Expect a meaningful optimization trial without providing operating rules or usable planning data.
    • Need a fixed-price implementation commitment before agreeing the product scope and integration responsibilities.

    TSI buyer-fit guidance; confirm the proposed configuration and local supply directly with the exhibitor.

    Product and service shortlist

    A shortlist built around three planning jobs

    These are published DELMIA offerings, selected for different operational decisions. They are not a claim that every product or workflow will be demonstrated on the stand.

    DELMIA Quintiq Optimized PlanningDELMIA Ortems Production SchedulerDELMIA Quintiq Logistics Planning

    DELMIA Quintiq Optimized Planning

    Quintiq Optimized Planning is the starting point for a business-specific planning model that has to reconcile production capacity, raw materials, workforce and logistics. Dassault Systèmes describes a configurable approach that incorporates operating rules and contractual constraints while optimizing against the organisation's KPIs. For a manufacturer facing a component shortage, bring a small order set and identify the commitments that cannot move. Ask how alternative allocations would be compared and which constraint takes precedence when targets conflict. The useful outcome is a model scope: decisions included, rules supplied by the buyer, required data and a measurable test. Published supplier performance claims should not be treated as a forecast for that test.

    DELMIA Ortems Production Scheduler

    Ortems Production Scheduler addresses short-term sequencing at finite capacity, with product and process constraints across machines, tools and operators. Its published scope includes made-to-order and inventory-based production, sequence optimization and collaborative planning. A planner evaluating it could use one work centre with competing jobs, different set-ups and a late material delivery. Ask the team to show what must be entered, how a revised sequence is assessed and how an accepted plan returns to the production workflow. The decision is whether the scheduler represents the constraints that actually govern release and dispatch, and how planners retain control when a schedule needs manual intervention.

    DELMIA Quintiq Logistics Planning

    Quintiq Logistics Planning extends the discussion to transport operations, from network design and longer-term scenarios through routing and operational replanning. Its published configuration options account for business rules such as customer service requirements, vehicle types, fleet availability and workforce constraints. A distributor could bring a depot, a representative day's deliveries and a changed delivery window, then examine how strategic assumptions affect the operational plan. Keep the review centred on which decisions belong in the optimization model and which remain with the transport management system or dispatcher. Leave with a proposed data flow and exception-handling sequence, rather than an unqualified promise that every logistics application will be replaced.

    Evaluation signals

    Evidence that makes the follow-up assessable

    Use these points when comparing the technical follow-up with the requirement you supplied.

    Model scope

    A named planning layer

    Request a decision-and-constraint inventory so that factory sequencing and network optimization are not priced as an undefined single project.

    Data readiness

    A usable representative dataset

    Check whether resource calendars, routes, changeover information and contractual rules exist in a form the proposed model can use.

    Evaluation

    A baseline and acceptance measures

    Agree how feasibility, planner effort and chosen operational KPIs will be compared on the same sample problem.

    Model scopeData readinessEvaluation

    Request a decision-and-constraint inventory so that factory sequencing and network optimization are not priced as an undefined single project. Agree how feasibility, planner effort and chosen operational KPIs will be compared on the same sample problem.

    Company Background

    Engineering software roots, a distinct operations portfolio

    Founded in 1981 and based in Vélizy-Villacoublay, France, Dassault Systèmes developed from its CATIA design roots into a broader software business built around the 3DEXPERIENCE platform. DELMIA is its operations brand, with offerings spanning industrial engineering, manufacturing operations and planning. For this event, the company's breadth matters because planning projects often sit between engineering assumptions and operational systems. It also makes product selection important: the buyer should establish which DELMIA offering fits the decision at hand before considering a wider platform programme. Image source: Dassault Systèmes’ published DELMIA materials.

    Suggested meeting plan

    Prepare the technical conversation

    Suggested visitor preparation; appointment availability must be agreed with the exhibitor.

    Before the visit

    Prepare the relevant inputs

    1. Before requesting a meeting

      Prepare one disrupted order or operating day, its resource constraints, current planning inputs and the system that executes the plan.

    At the event and after

    Test the scope and record responsibilities

    1. During the technical discussion

      Compare the baseline plan with one changed constraint; trace the revised decision back to the source data and the receiving operational system.

    2. Agreed follow-up

      Request the proposed DELMIA product, data requirements, integration boundary, model owner and evaluation measures in the same follow-up.

    Meeting questions

    Five questions for Dassault Systèmes

    Use the questions that match your proposed application and ask for answers tied to that specific scope.

    1. Which of these decisions belongs in Quintiq, which in Ortems, and which should remain in our existing systems?

      The answer establishes a product boundary before a broad platform discussion turns into an implementation assumption.

    2. How would our actual machine calendars, changeovers and material constraints be represented and maintained?

      A scheduling model depends on rules that remain accurate after the initial configuration; identify the operating owner as well as the software function.

    3. When two service or cost objectives conflict, can planners see and change the optimization priorities?

      This tests whether the proposed model exposes the business trade-offs the planning team must defend.

    4. What data and interfaces are required to turn our representative problem into an evaluation?

      A concrete input list reveals preparation work and separates product configuration from integration effort.

    5. What baseline, acceptance measures and support responsibilities would you propose for a limited pilot?

      An agreed evaluation protocol makes a later proposal easier to assess than a general productivity or return-on-investment claim.

    Event details

    Plan the visit in Paris

    Venue: Paris Expo Porte de Versailles

    Dates: 1-2 December 2026

    Supply Chain Event 2026 takes place 1-2 December 2026 at Paris Expo Porte de Versailles, Paris. A stand number has not been verified for this profile; confirm the current location before arranging a visit.

    Prepare one disrupted order or operating day, its resource constraints, current planning inputs and the system that executes the plan.

    Official event information

    Organizer participation source

    Next step

    Send a defined requirement to Dassault Systèmes

    Request the proposed DELMIA product, data requirements, integration boundary, model owner and evaluation measures in the same follow-up.

    Website
    Practical questions

    Practical questions before the visit

    What is the difference between the Quintiq and Ortems products in this shortlist?

    Quintiq Optimized Planning addresses configurable supply-chain planning across business constraints; Ortems Production Scheduler focuses on detailed short-term production sequencing. Quintiq Logistics Planning is the transport-oriented entry point. The product boundary should be agreed against the buyer's actual decisions.

    Is 3DEXPERIENCE itself the specific product to request?

    It is the wider platform context. For this meeting, name the planning requirement and ask which DELMIA offering and deployment scope the team recommends.

    What should a manufacturing planner bring?

    A representative order set, resource calendars, material constraints and an example of a disruption that is difficult to resolve in the current process. Use approved or anonymised data for any evaluation.

    Are the illustrated products confirmed show demonstrations?

    No demonstration schedule has been verified. The offerings are drawn from official product pages; arrange the relevant specialist and evaluation scenario directly with the exhibitor.

    Where and when is Supply Chain Event 2026?

    The event runs 1–2 December 2026 at Paris Expo Porte de Versailles, Pavilion 1. Confirm the exhibitor's current stand location and appointment availability through the organiser and company.