Data Centre World Madrid 2026 brings Spain's data centre infrastructure market to IFEMA Madrid on 4-5 November 2026. The free trade show fills Pabellones 3-5 with more than 160 exhibitors of cooling, power, racks, cabling, edge and AI infrastructure, three content theatres and a full-scale Data Center del Futuro.
As the data centre anchor of Madrid Tech Show, it gives operators, CTOs and investors from Spain and Portugal two focused days to compare suppliers and plan capacity. The 2025 edition drew more than 6,000 qualified visitors and 80 speakers.
TL;DR
1Dates: Wednesday 4 - Thursday 5 November 2026, 10:00-19:00 daily.
3Entry: free trade-visitor registration; no paid ticket tier is printed.
4Scale: 160+ exhibitors, 80+ speakers and 6,000+ qualified visitors reported by the organiser.
5Focus: three theatres plus Data Center del Futuro, a full-scale data centre replica.
Why visit
Visit to compare cooling, power, rack and cabling suppliers in one hall, hear operator case studies in three theatres and walk the full-scale Data Center del Futuro. With free registration and 160+ exhibitors, two days is enough to shortlist vendors for a live capacity, efficiency or AI-readiness project.
Why exhibit
Exhibit to reach data centre operators, CTOs and project managers from Spain and Portugal in a market adding capacity quickly. The show shares a free visitor badge with Madrid Tech Show, so a stand also meets cloud, cybersecurity and AI buyers. The Data Center del Futuro formats suit hardware demonstrations.
Attendees, exhibitors & solutions
Who this event is for
Visitor profile
Typical attendee groups you can expect to meet.
Data centre operations and delivery managers specifying cooling, power and racks
CTOs, IT directors and heads of infrastructure planning AI-ready capacity
Consultants, integrators and engineers designing or commissioning facilities
Investors, developers and utilities teams assessing Iberian data centre projects
Exhibitor profile
Main supplier and exhibitor segments present at the show.
Cooling, liquid cooling and thermal management suppliers
Power distribution, UPS, generators and energy management vendors
Rack, cabling, containment and modular construction providers
DCIM, monitoring, cybersecurity and edge computing software firms
Madrid is absorbing hyperscale, colocation and AI-driven capacity, so the show sits where cooling, power and construction budgets are being committed. A visitor can meet most Iberian suppliers in two days and compare quotes across halls 3-5.
Audience quality
High-value decision-makers
The audience is filtered by registration and dominated by data centre operations, IT infrastructure and project delivery roles. Organisers report 32% C-level attendance, which suits vendors selling capital equipment rather than consumer products.
Exhibitor outcomes
Real business growth
ROI comes from qualified conversations with operators and integrators, not raw footfall. A 9 sqm shell stand costs an estimated EUR 3,000-4,500; exhibitors should book 6-8 weeks ahead and staff the stand with technical sellers who can discuss load, cooling and compliance.
Intelligence
Market context
Key market insights, trends, news and related events to help you understand the bigger picture.
Europe / Iberia
Why it matters
Spain combines renewable generation, subsea cables and available land, attracting hyperscale and colocation investment. Madrid is the country's main connectivity and enterprise hub, so the show concentrates the buyers specifying cooling, power and AI-density capacity for Iberia and southern Europe.
Industry trends
Key trends shaping this market and its wider industry.
01
AI rack density forces liquid cooling
Operators are moving from air cooling to direct-to-chip and immersion systems as AI racks pass 50 kW. Vendors at the show compete on heat reuse, water use and retrofit speed.
What it changes: Cooling decisions now determine how much AI capacity a hall can support, making this the first stop for operators planning upgrades.
Multi-year grid connection queues are pushing developers toward behind-the-meter generation, batteries and power purchase agreements. Spain renewable capacity helps, but interconnection remains the bottleneck.
What it changes: Power strategy, not building shell, sets project timelines; buyers use the show to compare turbines, fuel cells, batteries and energy contracts.
Prefabricated power and cooling skids shorten build schedules and allow phased capacity. Design and construction theatres focus on standardisation, cost control and permits.
What it changes: Speed to capacity protects revenue in a supply-constrained market, so modular suppliers are relevant to both hyperscale and colocation buyers.
Book Madrid 6-10 weeks out; London and Frankfurt sell exhibition space earlier.
Data Centre World Madrid sits inside Madrid Tech Show and connects to the wider Data Centre World series. Buyers planning a year of sourcing can pair it with London in spring and Frankfurt in autumn.
4–5 Nov 2026
Data Centre World Madrid / Tech Show Madrid 2026
Madrid, Spain
Co-located with Cloud & AI Infrastructure, Cyber Security World and Big Data & AI World.
Visitors from India, China and other non-visa-exempt countries
$100.00
15 calendar days, longer in peak season
EU/EEA and many visa-exempt nationals can enter Spain for short business trips with a passport. Check the Spanish foreign ministry list before booking.
Spain accepts ATA carnets for temporary import of exhibition goods; confirm the goods list with customs and the freight forwarder.
November in Madrid is cool and changeable: daytime 12-16 C, nights 5-8 C, with around 40-50 mm of rain across the month. Bring a light coat and an umbrella.
Plan for the climate
Check temperatures and pack accordingly
Venue connectivity
IFEMA has paid Wi-Fi; mobile 5G coverage is good across Madrid. EU roaming applies for European SIMs; travellers from outside the EU should buy a local eSIM.
Ride-hailing
Taxis
Public transit
Car rentals
Cultural notes
Useful information to help you have a smooth and respectful visit.
Late dinners
Madrid dines late; restaurants peak after 21:00, so book evening tables accordingly.
Tipping
Tipping is modest; rounding up or leaving 5-10% is normal for good service.
Practical guides
Visitor & Exhibitor Essentials
Everything needed to arrive prepared, navigate the event, and make the visit productive.
Flights
Destination: MAD
Book 4-8 weeks ahead; November is shoulder season and fares are usually lower than December.
Data Centre World Madrid 2026 runs on Wednesday 4 and Thursday 5 November 2026 at IFEMA Madrid, in Pabellones 3-5. The show opens from 10:00 to 19:00 on both days. It is part of the sixth Madrid Tech Show, alongside five other technology trade shows under the same roof.
Where is Data Centre World Madrid 2026 held?
It is held at IFEMA Madrid, Avenida del Partenon 5, 28042 Madrid, in halls 3, 4 and 5. The venue is about 12 km from Adolfo Suarez Madrid-Barajas Airport and is served by Metro line 8 to Feria de Madrid station. Follow signs for the Pabellones 3-5 entrance.
Is Data Centre World Madrid free to attend?
Yes. Visitor accreditation for Data Centre World Madrid and the co-located Madrid Tech Show is free when requested in advance through the official website. Trade visitors register online, receive a badge and can attend the exhibition and theatre sessions at no charge. No paid visitor ticket tier is printed for 2026.
Who should exhibit at Data Centre World Madrid?
Suppliers of data centre infrastructure should exhibit: cooling and liquid-cooling systems, power distribution and UPS, racks and cabling, modular construction, monitoring software, cybersecurity and edge computing. Exhibitors meet data centre operators, CTOs, project managers and investors from Spain and Portugal. The Madrid edition reports more than 160 exhibitors.
What can visitors see at Data Centre World Madrid?
Visitors see three content theatres covering energy and sustainability, investment, design and construction, and edge, efficiency and AI solutions. The centrepiece is Data Center del Futuro, a full-scale working replica of a data centre with cooling, power, cabling and lighting. More than 160 exhibitors show equipment and services across halls 3 to 5.
How many visitors and exhibitors does Data Centre World Madrid attract?
The official 2026 page reports more than 160 exhibitors, more than 80 speakers and more than 6,000 qualified visitors for Data Centre World Madrid. The wider Madrid Tech Show 2025 edition, which hosted the data centre event, reported more than 470 exhibitors and sponsors, 400 speakers and 27,000 professionals.
What are the opening hours of Data Centre World Madrid 2026?
The exhibition is open from 10:00 to 19:00 on both Wednesday 4 and Thursday 5 November 2026. Most conference sessions run inside those hours, and the exhibition halls close at 19:00. Arrive before 17:00 if you want time for supplier meetings, because the last hour is usually quiet.
How do I register for Data Centre World Madrid 2026?
Register online through the official Tech Show Madrid website before travelling. Choose the Data Centre World pass, complete your company details and download your badge. Registration is free, and on-site collection uses the badge QR code at the IFEMA entrance. Bring photo identification that matches the name on your registration.
Who organises Data Centre World Madrid?
Data Centre World Madrid is organised by CloserStill Media, the international trade-show group behind Data Centre World London, Frankfurt, Singapore and Madrid. The Madrid edition is part of Tech Show Madrid at IFEMA and is co-located with Cloud & AI Infrastructure, Cyber Security World, Big Data & AI World and other technology shows.
Is Data Centre World Madrid trade-only?
Yes, the event is aimed at trade and professional visitors. Registration is free but the programme, exhibitors and networking are designed for data centre operators, IT infrastructure buyers, consultants, investors and technology vendors. Members of the public without a business interest are not the target audience, although no minimum age is printed.
Glossary
1
PUE
Power Usage Effectiveness: total facility power divided by IT equipment power. A lower PUE means less energy is lost to cooling, losses and overheads.
2
Liquid cooling
Direct-to-chip or immersion cooling that removes heat with a liquid rather than air, used for high-density racks running AI workloads.
3
Edge computing
Processing data close to where it is generated, in small facilities or on-premise sites, to cut latency and backhaul traffic.
4
Colocation
A data centre where several customers rent space, power and connectivity while owning their own IT equipment.
5
Hyperscale
Very large data centre campuses built by cloud providers, typically above 100 MW and designed for rapid, modular expansion.
6
UPS
Uninterruptible power supply: batteries or flywheels that carry the IT load until generators start or power returns.
7
Rack density
Power drawn per rack, measured in kW. AI racks can exceed 50-100 kW, forcing liquid cooling and new power designs.
8
DCIM
Data centre infrastructure management software that monitors power, cooling, assets and capacity across a facility.
9
AI inference
Running a trained AI model to answer requests. It drives dense compute and continuous, variable power demand in data centres.
Also known as
Alternate names and search phrases for this event.